|
|
| When creating the production order, inspection lot do not create.
What are the steps for configuration setting? QM view had been maintained and insp. setup and have also maintained OPL8 inspection type In-Process Insp. for Production Order(03). Answer: The following are the steps for setting up production order inspection lot. 1) Create FG material : MATQM_RR : MM01 2) Create RAW materials : QMR1_RR & QMR2_RR : MM01 CHECK : CLASSIFICATION VIEW BATCH MANAGEMNET 3) Create BOM : CS01 4) Create ROUTING : CA01 Assign the control key which has inspection Characteristics REQ. ( EX : PP06) During the creation, there might be an error saying: THE INSPECTION Characteristics REQ. 5) Create Characteristics : CT04 THICK_RR : ( THICKNESS IN MM FOR THE RANGE 15~20) HARD_RR : ( HARDNESS IN % FOR THE RANGE 16~ 20) 6) Create CLASS : CL02 QMCLS_RR Assign the Characteristics : HARD_RR & THICK_RR 7) GO TO MM02 : ASSIGN THE QMCLS_RR FOR FG & R1& R2 Assign the CLASS (QMCLS_RR) to all the materials. 8) Create MASTER INSPECTION Characteristics : QS21 Create MASTER INSPECTION CHAR FOR BOTH : HARD_RR & THICK_RR 9) Create A QUALITY WORK CENTER : WQM Make the usage : 002 (ONLY INSPECTION PLANS) Select the control key as : QM01 10) Create INSPECTION PLAN : QP01 For FG MATERIAL : Usage=5, ASSIGN THE INSPEC. CHARS 11) Create INSPECTION PLAN : QP01 For QMR1_RR MATERIAL : Usage =5, ASSIGN THE INSPEC. CHARS For QMR1_RR MATERIAL : Usage =6, ASSIGN THE INSPEC. CHARS 11) Create INSPECTION PLAN : QP01 For QMR2_RR MATERIAL : Usage =5, ASSIGN THE INSPEC. CHARS For QMR2_RR MATERIAL : Usage =6, ASSIGN THE INSPEC. CHARS 12) FOR IN PROCESS INSPECTION TO GET ACTCIVATED : CA02 Assign the inspection Characteristics in the routing. CHECK FOR ERRORS & THEN SAVE 13) Create PURCHASE ORDER FOR THE RAW MATERIALS : ME21N Create for both QMR1_RR & QMR2_RR 14) RELEASE THE PURCHASE ORDER : ME28 15) GOODS RECEIPT : MIGO ( AGAINST THE PO) System has to create the batches for the materials. 16) GO TO INSPECTION LOT : QA32 Look for the created batches of the Res, Materials Record the results Save the recorded results Usage Decision 17) Create A PRODUCTION ORDER FOR THE HEADER Create & Release 18) DO THE GOODS ISSUE TO THE PRODUCTION ORDER (MIGO) 19) DURING THE GOODS ISSUE , AGAIN ONE INSPECTION LOT MIGHT HAVE GENERATED 20) AGAIN TO INSPECTION LOT : QA32 Record the results Save the recorded results Usage Decision 21) DO THE CONFIRMATION OF PRODUCTION ORDER : CO15 / CO11N 22) ONCE CONFIRMATION IS DONE, DO THE MIGO : GOODS RECEIPT 23) DURING THE GOODS RECEIPT ALSO, AGAIN INSPECTION LOT GETS GENERATED 24) AGAIN GOTO INSPECTION LOT : QA32 Record the results Save the recorded results Usage Decision 25) Now check the stocks.
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|