Basic Necessity For Project
Profile
What is the basic need or necessity for a project profile?
Project profile is basic heart of Project configurations.
The values maintained in the project profile determine the functionality
of certain areas of the Project System. These values cannot be changed
without prior thought. Sections like Basic data, Time scheduling, Costs/revenues/finances,
Organizational data must be maintained for the project profile.
Control data like Project type, field key, simulation profile, validation,
substitution, project stock, automatic requirement grouping, status management,
sales pricing can be entered in this field.
Organizational data like Company code, Controlling area, Business Area,
Plant, Profit Center, Proj. Currency can be entered in this field.
Project Planning board is option of viewing the project along with
WBS, network, activities in the form of Gantt Chart. It contains data such
as scheduling profile, factory calendar, network profile; planning board
profile can be entered in this field.
Controlling data such as Object class, Indicator for Statistical Cost
& Integrated Planning, Planning profile, Budget profile, Costing Sheet,
Interest profile, Settlement profile, settlement rule strategy can be entered
in this field.
Use transaction OPSA to create project profile, and maintain
the data such as organization, controlling parameters, diff. profiles etc.
in it. The data will get defaulted whenever project is created using this
project profile.
The project profile contains default values and other control parameters
such as the planning method for dates and costs.
The data that you enter in the project profile will be copied into
a project in its project definition or in the WBS elements which can later
be overwritten.
Examples:
- To call up the graphic, you must first have specified various graphic
profiles in the project profile.
- To carry out cost planning you must specify a planning profile.
- To carry out financial budgeting you must specify a financial planning
profile.
You can maintain the various profiles which must be present in the
project profile in the implementation guide for the Project System and
also in the cross-application IMG. For example, the settings for the graphic
are made by choosing Basis -> Frontend Services -> Network/Hierarchy.
Notes:
Before creating the project profile - check all of your business requirements.
While creating the project profile - in OPSA
- under Tabs - choose & set CONTROL - project type, version profile.
- if any validations/substitutions, whether the project is treated
with Valuated stock/non-valuated stock, Status Management, Graphic profile
settings, Project Summarization if relevant, SD related if required based
on business process.
ORGANIZATION DATA - Controlling area, Controlling code, business
area, Plant, Profit center, Currency.
PLANNING BOARD /DATES - scheduling profile, network profile and
planning board graphic settings.
CONTROLLING DATA - object class (investment/PA),planning, budget,
result analysis, costing sheet, interest, investment, settlement-profile,
settlement rule strategy, graphics for Budget.
All of the above settings purely based on your project scenario and
in consultation with your FICO, MM.
Get help for your SAP PS problems
SAP PS Forum
- Do you have a SAP PS Question?
SAP Project System Books
SAP
PS Books - Certification, Interview Questions and Configuration
SAP Project System Tips
SAP PS Tips and Project System
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|