How to Handle Freight Charges at GR
in SAP MM (When Paid Directly to the Lorry Driver)
Let’s say you’ve issued a Purchase Order (PO) for 20
tons of goods. But instead of receiving everything in one go, the delivery
happens in two parts:
-
GR1: 10 tons + ₹1,000 freight (paid to lorry driver)
-
GR2: 10 tons + ₹1,500 freight (again, paid to lorry driver)
The freight is not billed by your material vendor and can't
be planned in advance—you only know the amount when the truck shows up.
Plus, the vendor's invoice arrives 10 to 15 days later, so you want to
account for the freight costs immediately, without delaying invoice verification
(LIV).
Best Solutions: Real, Working SAP MM Options
Option 1: Create a Separate Service PO for the Freight Vendor
This is the cleanest and most auditable way.
Steps:
1. Create a standard PO for your material (20
tons).
2. As and when the lorry arrives, create a new service
PO for the freight service (Rs. 1000 / Rs. 1500).
3. Post the GR normally for the materials.
4. Use F-47 and F-48 to post down payment and actual
payment to the lorry driver.
5. Do Invoice Verification (MIRO):
-
First for the material vendor (Goods/Service items only).
-
Then for the freight vendor (choose Planned Delivery Cost
to input exact value).
Why it's great: Keeps freight billing separate and matches
actuals. Works even if the freight changes per truckload.
Option 2: Use MIRO – Planned Delivery Cost During LIV
Sometimes you don’t need a separate PO. You can handle
it all during invoice verification.
Steps:
1. Post GR as usual.
2. In MIRO:
-
Choose “Goods/Services + Planned Delivery Cost”.
-
Enter the freight charges manually in the second line item.
-
Set the invoice party as the lorry driver or freight service
provider.
Bonus Tip: This only works well if you're okay with freight
cost being capitalized or absorbed into material valuation.
Option 3: Unplanned Delivery Cost Entry in MIRO
This is the fastest, though least transparent option.
Steps:
1. After GR, go to MIRO.
2. Enter the invoice for the material vendor.
3. Use the "Unplanned Delivery Cost" field to plug in
the actual freight.
4. The cost will be absorbed into the material cost or
posted to a price difference account.
When to use: If you're in a rush and okay with freight cost
being bundled into material cost without showing it explicitly.
Option 4: Subsequent Debit for Freight Costs
This one's great if you've already done GR and material invoice,
and now want to account for freight after the fact.
Steps:
1. Create PO for material vendor (no freight
planned).
2. GR the goods.
3. Do LIV for the material vendor.
4. Use Subsequent Debit in MIRO:
-
Change the invoicing party to the lorry driver.
-
Enter the exact freight cost.
When to use: When freight cost wasn't known at the time of
initial LIV.
Real-Life Scenario Recap
Action: GR of material — Vendor Type: Material Vendor —
Tool: MIGO — Comment: Standard Goods Receipt
Action: Freight payment (Rs 1000) — Vendor Type: Lorry
Driver — Tool: F-47/F-48 — Comment: Down Payment
Action: Invoice for material — Vendor Type: Material
Vendor — Tool: MIRO — Comment: Select “Goods/Service items”
Action: Invoice for freight — Vendor Type: Lorry Driver
— Tool: MIRO — Comment: Select “Planned Delivery Cost”
Pro Tips
-
Keep the freight vendor (lorry driver) master data ready
in the system. Mark them as a service vendor if needed.
-
Use internal freight condition types (like FRA1) in PO for
better traceability—even with dummy values.
-
Use account assignment category 'K' (Cost Center) if freight
isn't related to inventory value.
-
For frequent freight scenarios, build a freight framework
PO and draw from it as needed.
Final Thoughts
When your freight isn't planned in the PO and is paid directly
to the transporter, SAP gives you flexibility. Whether it’s a service
PO, planned delivery cost during MIRO, or subsequent debit, the trick is
picking the method that suits your organization’s auditability, accounting
practices, and operational speed.
Get help for your SAP MM problems
SAP MM Forums
- Do you have a SAP MM Question?
SAP MM Books
SAP Material
Management Certification, Interview and Configuration Reference Books
SAP Material Management Tips
SAP MM Configuration
Tips and Materials Management Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|