Explain how and when to use MDAB transaction.
At the beginning of the implementation when we are done with the organization
structure (define Plant.. etc.), we have to activate the MRP in the TC:
OMDU
This will take care of all planning file entries for all the materials
created afterwards and that are relevant for planning.
If some materials are created before the activation of MRP, in that
case we use this transaction MDAB, for those material to be entered in
the planning file.
MDAB is for creating the planning
file entries in background. So when you go-live you can schedule this job
and it will create planning file entries for all the material in that plant.
If required you can also schedule this job to be run once in a month
to take care of all the new materials. (if you create them by batch jobs).
Also you can use this transaction along with consistency check for the
planning file MDRE
1. What do MDAB does?
This creates a Planning file entry
2. Why do we run this for first time when MRP is started?
As the system needs to identity what all the materials that has to
be included in the planning run.
This Transaction creates a planning file entry to make the mrp run
at background to pick the materials and to include in the MRP run.
3. Do we need to run regularly?
The answer is No.
Once the mrp is run the planning file entry will be removed and again
it will be populated when a stock change occurs, a sales order gets created,
etc.
Can we get a list of materials for those planning file entry is
generated through background job using t-code MDAB ?
You will get that list from accessing database table MDVM
or DBVM
Notes:
Planning File creates all the materials relevant for the planning run.
The planning run and the scope of the planning run (which materials
are planned in which planning run) are controlled by the planning file.
For planning file entry use the following transactions,
MD20 : Create planning file entry
MD21 : Display planning file entry
MDAB : Set up planning file entry
in background
MDRE : Check planning file entry
Please run this in it will solve your problem
All materials assigned with MRP are automatically entered in planning
file entry.
Depends on changes in material planning or in proposal, system will
create planning file entry.
When MRP run, system will consider only which materials having entry
in above contents of planning file entry. After MRP run, system delete
the planning file entry. And again, when material have changes like GI
GR on any other demand, then system generate planning file entry again.
Get help for your SAP PP Problems
SAP PP Forum - Do you have
a SAP PP Question?
SAP Production Planning Books
SAP PP Certification,
Interview Questions and Configuration Books
SAP PP Tips
SAP PP Tips and Production Planning/Control
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|