MRP Not Creating Purchase
Requisition
When running MD01, purchase requisition was not created to a certain
material, but when using MD02, purchase requisition was created.
Answer:
MD01 requires a planning file entry, MD02 does not. Check/create
appropriate entries in MD20. For all materials in background use
MDAB. Might also have to fix inconsistencies using MDRE.
Depending on how your master data is being maintained, you may not
automatically get a planning file entry when a material is made relevant
for planning. As a backstop measure, many companies rebuild the planning
files regularly just prior to the MRP runs, using the batch program noted
earlier.
Checklist when purchase requisition not created:
- Check whether you have maintained the purchasing view for that raw
material or not.
- Check if already there is stock of the raw material maintained in
the system. If the available stock is sufficient for the order quantity,
then the system will not generate purchase requisition. Run MD04
/ MD05 and check order tree for the material for which you are doing
the MRP run. System will show if there is stock available.
- Check whether the Material is defined for "F" - External Procurement
in MRP2 view of the material master.
- Check whether the material type used for the material is enabled
for "External Purchase orders". Transaction 'OMS2'.
- Check purchase requisition number range is not exhausted. Tcode
'OMH7'.
Notes:
If you have updated MD20 you cannot revert back the changes
made.
Reverting this entry is not standard SAP functionality. In the most
common business scenarios, if one wishes to be able to plan a material
using MRP, they also need to have a planning file entry. SAP will normally
create this entry automatically under most standard conditions that require
it. Certain uncommon scenarios will leave a material/plant in a condition
where planning is required, but SAP has not created the appropriate planning
file entry. For these instances, SAP provides the transactions I mentioned
previously.
Archiving (physically deleting a material from the database and copying
it to long-term storage) will remove planning file entries. Changing a
material to non-planable (ND) will remove the entry. I can't think of any
other standard MRP process that will remove a planning file entry.
The usual business requirement is, "how can I ensure that all planable
materials have the appropriate planning file entry".
What code to display all Purchase Requisition generated by MRP LIST?
You need to use ME5A report with dynamic selection. In dynamic
selection (it will appear next to variant button) you need to choose creation
indicator. Give creation indicator as "B" which material requirement planning
and execute the report.
Get help for your SAP PP Problems
SAP PP Forum - Do you have
a SAP PP Question?
SAP Production Planning Books
SAP PP Certification,
Interview Questions and Configuration Books
SAP PP Tips
SAP PP Tips and Production Planning/Control
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|